Today our renovation crew had a day off from Anita’s house, so they worked on fixing up a shipping container and a portable shed to be the new Hermits’ Rest hay loft and tack room.

It wasn’t the easiest task in the world, but by gosh, the team got it done! Leveling the portable building we’d brought over from our church building wasn’t too bad. With enough concrete blocks and shims, it ended up looking great. And they made me a step to get into it.

Getting the container level was an ordeal. At first not even the backhoe could lift it. So the team had to take all the dang bags of concrete back out, the ones you faithful readers might remember were a problem a while back. Then the backhoe could raise it up.

Everything is way up in the air, at least on one end. That will encourage drainage, since it’s all on a slope. The plan is to add some siding to make it look better. But to me it looks great.

Once they got it all level, they started to insulate it, beginning with the ceiling. I guess they had some insulation left over from another project. They also began to put the old ceiling tiles from the church over the insulation, but it’s rather fragile.

Tiny mom brag: my kid did a good job cutting all the pieces up! The future will probably include inexpensive paneling on the walls. It will look rustic.

It’s sure looking better, and I feel much closer to tack and hay storage! The tack room will have air conditioning and a little refrigerator for medicine and drinks, plus lights and lots of shelving. Of course there will be saddle racks, hangers for other tack, and a desk. Plenty of space for feed and supplements, too. For me, there will be a chair.

None of the activity bothered the horses at all. Drew and Apache got their feet trimmed with no problems. Both just enjoyed the attention.

I’m grateful for all the hard work of our team. I’m grateful to be here, enjoying the beauty of spring, listening to the swallows, and loving my family. Peace.
