Getting started already? Where’s the concrete mixer? No, before the pool people get started, the Hermits’ Rest team has to prepare for their arrival. The first step for that is to reconfigure our fencing so a) the equipment can get into the back yard, and b) the dogs are kept out of the construction zone.
The dog part is made difficult, since we have to block off part of the back porch, but lucky for us, there’s a gate waiting to be used for something.

Then we had to figure out where to put a temporary fence. It was important to Lee to have as much space as possible for the six dogs to poop, and I certainly saw his point! The first place we selected was deemed too close to where pool workers will have to be.

Eventually we figured something out, and vowed to get more fencing up in front, which is already in the plans anyway, so the dogs won’t feel confined. The poor dears. After that, it was a quick matter of putting in the t-posts.

Only one post got all bent up by a rock or something, so that was pretty good. I got to fetch more posts, and had the challenge of getting them out of their packaging with nothing to break the strap that held them together. Ranchhand Suna managed just fine!

The posts aren’t in all the way, so it will be easier to get them out when the project is over. Next up is adding the actual fencing material. The plan is to re-use some old shorter lengths of fencing rather than use any of the new rolls, which we will want for permanent fencing that is going up soon.
After that, the fence between the house and the garage will have to be removed so that bulldozers, bobcats, cement trucks, and equipment delivery vehicles can get in. One good thing about having absolutely NOTHING behind the house other than one pitiful tree is they won’t harm anything as long as they stay away from the propane tank and septic area (which will be marked!).
Hope your weekend was productive or restful, whichever YOU prefer!