Continuing Up

No doubt you’ve been wondering two things. No, not why I keep writing and why I share my journey all the time! You wonder How the floor in my future office is turning out and how those stairs are coming along! Of course.

Still drying.

Well, the office floor sat and dried a long time. We hoped it had filled in all the gaps. Then, a couple of days ago, Chris put in clear silicone gel. It’s now drying.

The white stuff needs to turn clear.

Once it clears and dries, he will put in clear gel or something. Then we will have a floor. Maybe it’s not what we envisioned, but it will be pretty.

More rails.

As for the stairs, the framework now goes all the way up.

Hey, it’s safer already! The rail shown below goes across the top here.

Chris has carefully marked where each of the rails will go. And he’s making them now.

Marks for what size metal rod goes where.

The first one he’s completed shows the pattern. There’s a large center piece, then another every four inches going both ways from there.

You can see the pattern here.

The small ones are either 1/2” or 3/4”, and there’s a subtle pattern. Depending on how wide a piece of railing is, there may be more or fewer small ones.

Just after the final piece was attached.

When it’s all done, he’ll paint everything black, then install it permanently. Just a couple of attachments using the acetylene torch will turn the whole thing into one piece and it can be attached to the stairs.

This welding has to be done outside, due to sparks that would eat the floor.

I hope you found these pictures as interesting as I did. It’s fun to see safety, creativity, and craftsmanship all come together this way!